单项选择题
When building a NIC team (virtual port channel) between a host and a pair of Cisco Nexus 5000 Series Switches that will carry FCoE traffic, what is the maximum number of physical links that can exist in the team?()
A. 1
B. 2
C. 4
D. 5
E. 16
点击查看答案
相关考题
-
单项选择题
WhichstatementiscorrectaboutthenumberofavailableQoSsystemclassesinFCoE?()
A. It’s hard-set and cannot be disabled
B. It’s configurable, with an upper limit of 16
C. It’s hard-set but cannot disable best-effort and Fibre Channel
D. It’s hard-set but can disable all but one class
E. It’s configurable with an upper limit of eight -
单项选择题
WhichmechanismdotheCNAandtheCiscoNexus5000SeriesSwitchesusetoprovidealosslessclassofEthernettraffic?()
A. LLDP
B. LACP
C. PFC
D. FIP -
单项选择题
Which statement describes the below output from an MDS switch?() Flow ID. 44 Initiator VSAN: 200 Initiator WWN: 50:06:04:8a:cc:19:12:db Target VSAN: 200 Target WWN: 50:06:04:8c:de:ad:be:ef T arget LUN: ALL LUNs Flow Verification Status: ------------------------- Initiator Verification Status: success Target Verification Status: WWN was not found in name server Initiator Linecard Status: success Target Linecard Status: Status not yet checked Feature Status: --------------- Write-Acceleration enabled Write-Acceleration Buffers: 1024 Configuration Status: flow verification failed
A. The zone containing both the initiator and target does not exist
B. The zone set has not been activated
C. The target is not logged into the fabric
D. The pWWN used for the target is invalid