欢迎来到计算机考试题库网 计算机题库官网
logo
全部科目 > 软件认证工程师考试 > 思科认证考试 > CCNP系列认证 > CCNP(642-983)

单项选择题

Which blade of the ucs solution is best able to accommodate the resource requirements of virtual machine growth?()

    A.UCS B250 M1 (EXPANDED MERNORY Blade Server)
    B.UCS B200 M1 (Half-width Blade Server)
    C.UCS 2100 IOM (IO Module)
    D.UCS VIC M81KR (Virtual CNA)

点击查看答案

相关考题

  • 多项选择题
    WhichtwostatementsregardingconfiguringhighavailabilyintheCiscoUCSiscorrect?()

    A.High availability is enabled during the configuration of either HSRP or VRRP from global configuration  mode
    B.High availability is configured during the initial setup of both Fabric interconnects
    C.High availability can only be configured via the CMC
    D.High availability is enabled during theinitial configuration of one of the Fabric  lnterconnects

  • 多项选择题
    Whichtwostatementsarecharacteristicsofpingroups?()

    A.they are used internally within fcoe to map a vsan to a specifc vlan
    B.they pin traffic fro a specific compute node mezzanine card to aspecific up link port
    C.an iplink port for the adapter is chosen automatically if no pin group is set

  • 多项选择题
    WhichtwostatementsregardingSNMPmonitoringofaUCSsystemarecorrect?()

    A.SNMP v3 is supported
    B.includes same MIBs as the Cisco Nexus7000
    C.does not provides MIBs downstream of the fabric interconnect
    D.includes same MIBs as the Cisco Nexus2000

微信小程序免费搜题
微信扫一扫,加企业群免费搜题

微信扫一扫,加企业群免费搜题