单项选择题
The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.
A.Riskldentification
B.Quantitative Risk Analysis
C.Qualitative Risk Analysis
D.Risk Monitoring and Control
点击查看答案&解析
相关考题
- 单项选择题 Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to()progress.
- 单项选择题 Estimating activity durations uses information on activity scope of(),required resource types, estimated resource quantities, and resource calendars.
- 单项选择题 Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.
- 单项选择题 Define Activities is the process ofidentifying the specific actions to be performed toproduce the()
- 单项选择题 During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.
- 单项选择题 The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.
- 单项选择题 ()involves using mathematical techniques to forecast future outcomes based onhistorical results.
- 单项选择题 Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.
- 单项选择题 The project()is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements,thresholds, and acceptance criteria.
- 单项选择题 The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()
- 单项选择题 Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.
- 单项选择题 The()process analyzes the effect of risk events and assigns a numerical rating to those risks.
- 单项选择题 Project()Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage,retrieval, and ultimate disposition ofproject information.
- 单项选择题 ()is a category assigned to products or services having the samefunctional use but different technical characteristics. Itisnotsameasquality.
- 单项选择题 Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
- 单项选择题 In approximating costs, the estimator considers the possible causes ofvariation of the cost estimates, including()
- 单项选择题 On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and()are so tightly linkedthat they are viewed as a single process that can be performed by a person over a relatively short period of time.
- 单项选择题 Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.
- 单项选择题 In the project management context()includes characteristics of unification,consolidation, articulation, and integrative actions that are crucial to project completion,successfully meeting customer and other stakeholder requirements, and managing expectations.
- 单项选择题 Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()